Austin Energy reported an average of 30,356 EV charging sessions per month during July–September 2026, compared with 36,293 in the same quarter of 2025. Comparing the utility's two original fiscal-fourth-quarter presentations yields 5,937 fewer reported sessions per month, or a 16.36% decline. At the same time, its separately reported 12-month rolling DC fast-charger uptime increased from 89% to 95%.12
Those figures tell different parts of the network's operating story. They do not establish that the same chargers saw fewer visits, that Austin-area EV demand declined, or that 95% of attempted charges succeeded. The presentations do not reconcile the number and types of stations included in the charging-session series across the two years.123
What changed between the two utility reports
Austin Energy's FY2026 Q4 operations update was included in the November 17, 2026 City of Austin Utility Oversight Committee meeting materials. Its FY2025 Q4 counterpart was published in November 2025. Fiscal Q4 means July through September for both usage charts, not October through December.12
| Austin Energy measure | FY2025 Q4 | FY2026 Q4 | Change from reported values |
|---|---|---|---|
| Average monthly charging sessions | 36,293 | 30,356 | −5,937 (−16.36%) |
| Average monthly electricity dispensed | 741 MWh | 687 MWh | −54 MWh (−7.29%) |
| Implied energy per reported session | ~20.42 kWh | ~22.63 kWh | ~+10.85% |
| Average charging time | 2 h 51 m | 3 h 29 m | +38 minutes |
| Overall network uptime, 12-month rolling | 99% | 98% | −1 percentage point |
| DC fast-charger uptime, 12-month rolling | 89% | 95% | +6 percentage points |
Sources: Austin Energy's original FY2025 and FY2026 quarterly operations presentations. All underlying counts, energy totals, duration and uptime values are utility-reported. Changes and approximate energy-per-session ratios are At The Charger calculations from those figures, not separately measured outcomes.12
The session decrease appears in each of the three months, not just the quarterly average. The utility's published July counts were 35,910 in 2025 and 30,470 in 2026; August, 36,649 and 31,109; September, 36,321 and 29,488, respectively. These are separate annual reporting snapshots, and the documents do not establish a matched set of chargers behind them.12
The implied energy-per-session row divides the reported monthly megawatt-hours by the reported average monthly session counts. It rises from about 20.42 to 22.63 kWh, even as reported total energy dispensed falls. Because the inputs are rounded aggregates, that ratio is not a directly observed typical charging session, nor evidence that the same vehicles spent more time charging.12
Uptime improved, but that is not a successful-charge rate
Austin Energy's fast-charger uptime improvement should not be mistaken for a new November discovery. In an October 19, 2026 fast-charging briefing, utility staff had already reported 95.1% uptime versus 89% a year earlier. The November fiscal-quarter presentation rounds the current figure to 95%. Both quarterly presentations label uptime as a 12-month rolling average, which is a different measure and observation period from their July–September session counts.123
An uptime figure does not tell a driver the share of visits that resulted in successful charging. The distinction is explained in At The Charger's existing public EV charging reliability metrics guide. The utility's published figures also cannot substitute for current station status or driver-facing price and availability information.
The unresolved comparison is the network denominator. Austin Energy's separate October briefing described more than 1,300 charging stations across public, workplace and fleet uses, including 30 utility DC fast chargers. Neither quarterly session slide establishes that its reporting population stayed constant or maps exactly to those figures. Changes in sites, station types or reporting coverage could alter totals, but no particular explanation is verified by the two reports.123
The defensible finding is narrower than a citywide charging-demand trend: two official Austin Energy snapshots report less charging activity and energy dispensed in FY2026 Q4 than in FY2025 Q4, while the separately measured rolling DC fast-charger uptime is higher. A like-for-like utilization judgment would require the underlying station inventory and reporting-method definitions that the reviewed slides do not provide.12
Sources
Footnotes
-
Austin Energy / City of Austin, FY2026 Q4 Operations Update, prepared as backup for the November 17, 2026 Utility Oversight Committee meeting, especially presentation slides 10–11. Reports July–September 2026 utility-network charging-session counts, energy dispensed, average duration and rolling uptime. Source is the network operator's own operational summary; it does not identify a year-over-year matched-port cohort. ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9
-
Austin Energy / City of Austin, FY2025 Q4 Operations Update, November 2025, presentation slides 10–11. Reports July–September 2025 charging-session counts, monthly energy, duration and rolling uptime. Historical as-published utility figures, not independent proof of a constant reporting station population. ↩ ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9
-
Austin Energy, Fast Charging Overview, Electric Utility Commission staff presentation, October 19, 2026. Already disclosed the 89% to 95.1% fast-charger rolling-uptime comparison and described an approximately 1,300-plus mixed public/workplace/fleet station portfolio with 30 utility DC fast chargers. These counts are not proven to match either quarter's session-reporting denominator. ↩ ↩2 ↩3